UT Health Science Center – San Antonio, TX

Complete renovation of 16,000 square feet OB/GYN Lab, including but not limited to: Interior demolition, sheetrock, tape and float, texture, painting, millwork, HVAC, simulation and digital visual software system installation, acoustical ceiling system, fire protection, window and door frames, hardware, installation of hospital room cubical tracks and curtains, tempered glass installation, toilet partitions and shower/bath accessories, various flooring including VCT, vinyl, carpet and ceramic tile, cabinetry and countertops, refrigerated compressed air dryer, vacuum pump, data cabling, lab simulation equipment, materials testing and inspections.

  •  Final Construction Cost: $1,112,779.64
  • Estimate Total: $322,000.00